How do I complain to the QBCC about defective building work?

Tell the contractor in writing first. The QBCC cannot accept a defective work complaint until the contractor has received written notice listing every defective or unfinished item with a time to fix them, and it expects you to give reasonable access for the repairs. If that fails, you lodge online and the QBCC may inspect and issue a direction to rectify.

Step by step

  1. Read your contract. It may set a dispute process and a defects liability period. New builds and major works often carry a 6 or 12 month period.
  2. Raise it with the contractor and name each item you think is defective, incomplete or not what the contract says.
  3. Send written notice by email or letter covering every item, with a timeframe. The QBCC's own example is 14 days. Notice is not needed if the contractor is bankrupt or insolvent with a cancelled licence, is deregistered, or has died.
  4. Allow reasonable access. That means a time agreed with the contractor, in normal working hours, with at least 48 hours' notice from them. It can run to consecutive full days. Refuse it and the QBCC loses the ability to direct the contractor to fix the work.
  5. Gather the documents. A home owner needs the notice and the contract. A later purchaser needs the notice, the contract of sale and any pre-purchase inspection report.
  6. Lodge through the QBCC portal. You get an email receipt with a case number.

The steps are from the QBCC's lodge a defective work complaint and help with defective work pages.

Is the job eligible?

For most building work the contract value, including labour, materials and GST, must be more than A$3,300. Plumbing, drainage, gas fitting, fire protection, building design and completed building inspections have no minimum. Electrical work is not the QBCC's field: that goes to the Electrical Safety Office.

Time limits

Type of defectLodge a QBCC complaintHome warranty claim
Non-structuralAs soon as possible, and no later than 12 months from completionWithin 7 months of completion
StructuralAs soon as possible, and within 12 months of noticing itWithin 3 months of noticing it, and inside 6 years 6 months of cover starting

Note how much tighter the insurance column is. A cracked tile bed noticed eight months after handover can still go to the QBCC as a complaint but is already out of time for a non-structural insurance claim.

What the QBCC then does

An assessment officer checks eligibility and contacts both sides. If nothing is agreed, a building inspector may inspect. Where a defect is found the QBCC can issue a direction to rectify, and the contractor usually has 35 days to comply. The direction shows on the contractor's public licence history. Either party can ask for an internal review of the decision, which the QBCC says may add about 28 days, and after that the matter can go to the Queensland Civil and Administrative Tribunal. Details are on the QBCC building issues and disputes page.

What it will not do

The QBCC cannot order anyone to pay or refund money, rule on what your contract means, tell the contractor how to do the repair, supervise it, or carry it out. Arguments about payments, variations and delay are contractual disputes, and the scheme does not cover those.

Quick answers

How long does a builder get to fix defects after a QBCC direction?

Usually 35 days. That is the period the QBCC gives in its description of a direction to rectify.

Do I have to let the same builder back to fix the work?

You must offer reasonable access. The QBCC says refusing it means it will be unable to direct the contractor to rectify, and it may affect a later home warranty claim.

Sources

All sources were opened in November 2026.

General information for Queensland home owners, written by the Bluegum Builders editorial desk in November 2026. It is not legal advice. Figures and rules change, so confirm them on the linked QBCC pages before acting.