Contracts
What deposit can a Queensland builder ask for?
It depends on the contract price. For domestic building work in Queensland the cap is 20% where the work is valued at A$3,300 or less, 10% for a level 1 contract (A$3,301 to A$19,999) and 5% for a level 2 contract (A$20,000 or more). One exception lets the deposit rise to 20% where most of the work is done off site.
The three bands
| Contract price (labour, materials and GST) | Contract type | Maximum deposit |
|---|---|---|
| A$3,300 or less | No written contract required, though a record is recommended | 20% |
| A$3,301 to A$19,999 | Level 1 | 10% |
| A$20,000 or more | Level 2 | 5% |
The caps come from the QBCC deposits and progress payments page and the bands from its contracts and agreement types page. The two pages word the top band slightly differently ("more than $20,000" on one, "$20,000 or more" on the other); we have used the contract page's wording. On a A$380,000 new house, 5% is A$19,000. On a A$12,000 deck, 10% is A$1,200.
The off-site exception
A deposit of up to 20% is allowed where substantial customised work or prefabrication happens away from the site and that off-site work is worth more than half of the total contract price. The QBCC's examples include made-to-measure kitchen cabinetry, windows, sheds, pergolas and cladding. A kitchen where the joinery is built in a factory and fitted in two days is the classic case.
What a level 1 contract must contain
- the names of the parties, with the contractor's name and licence number exactly as they appear on the licence
- the site address and a description of the work
- the contract price, or how it will be calculated
- the Queensland Home Warranty Scheme premium
- a completion date, or how it will be determined
- any plans and specifications
- a notice about your cooling-off rights
The contractor must hand you a fully signed copy within five business days of the contract being entered into.
What level 2 adds
From A$20,000 the contract must also include a start date (or the way to fix one), a fixed price or the calculation method with any prime cost items and provisional sums spelled out, a price change warning on the first page of the schedule, and the statutory warranties. You must also be given the QBCC Consumer Building Guide before you sign. If the guide turns up late, your cooling-off period stretches to match.
Why the cap matters to you
A deposit above the legal cap is money the Home Warranty Scheme will not refund if the builder never starts. The QBCC is blunt about it: pay only the lawful deposit, do not pay in advance of the contract's due dates, and never hand over more than 20% before work commences in any circumstances. Checking that the licence number on the contract matches a real record takes a minute on our search page or the QBCC's own register.
Quick answers
What is the deposit cap on a A$20,000 contract?
Five per cent, so A$1,000, because A$20,000 or more is a level 2 contract on the QBCC contracts page. At A$19,999 the cap would be 10%.
Can a kitchen company ask for 20% up front?
Only if the off-site exception applies: substantial customised work or prefabrication done away from the site that is worth more than 50% of the total contract price.
Sources
All sources were opened in November 2026.
General information for Queensland home owners, written by the Bluegum Builders editorial desk in November 2026. It is not legal advice. Figures and rules change, so confirm them on the linked QBCC pages before acting.