How long is the cooling-off period on a Queensland building contract?

Five business days. The clock starts the day after you receive a signed copy of the whole contract, plans and specifications included, and for contracts of A$20,000 or more you must also have been given the QBCC Consumer Building Guide. Withdrawing usually costs A$100 plus the contractor's reasonable out-of-pocket expenses.

Where the right comes from

Section 35 of Schedule 1B to the Queensland Building and Construction Commission Act gives the right, and every contract for building work valued at over A$3,300 must include advice about it. The QBCC cooling-off page summarises both sections referred to here.

Counting the days

Say you sign on a Thursday and the contractor emails the fully signed contract with drawings that afternoon. Day one is Friday. Weekends do not count, so the fifth business day is the following Thursday. If the contractor is slow to give you the signed copy, or the Consumer Building Guide on a level 2 contract, the period is extended; it does not start running until you have the documents.

How to withdraw

Give the contractor a written notice, signed by you, stating that you are withdrawing under the cooling-off provisions in section 35 of Schedule 1B. Send it in a way you can prove, and keep a copy. A phone call is not enough.

What you may owe

Under section 38 the contractor is usually entitled to A$100 plus reasonable out-of-pocket expenses incurred before you withdrew. A soil test or survey ordered straight after signing is the sort of expense that can be deducted, which is one reason some owners ask for those to wait until the five days have passed.

When there is no cooling-off right

The second exception catches people out. Getting a lawyer to read the contract is sensible, and the QBCC recommends it, but it does remove the cooling-off right, so make sure your questions are answered before you sign and not after.

Related: what each contract level must contain.

Quick answers

Does the cooling-off period include weekends?

No. The QBCC describes it as five business days, starting the day after you receive the signed contract and its documents.

Sources

All sources were opened in November 2026.

General information for Queensland home owners, written by the Bluegum Builders editorial desk in November 2026. It is not legal advice. Figures and rules change, so confirm them on the linked QBCC pages before acting.

More guides